Demolition of Former Atlantic City High School
Atlantic and Albany Avenues, Atlantic City, NJ
Bally’s Park Place/Hilton Hotel

 

          ADLER was selected by Park Place Entertainment Corporation to provide environmental and engineering
            services associated with the demolition of the former Atlantic City High School and construction of a new                             employee/valet overflow parking lot.   The four (4) story school and gym building had occupied an entire
            city block (~4 acres) and had been vacant for a few years.   Despite the failing condition of the building, the                         demolition of the school received media attention and created political controversy.  

 

            For the demolition activities, ADLER provided the following services:

·          Environmental assessment of the building and property.

·          Asbestos and lead based paint survey.

·          Preparation of environmental abatement and remediation specifications.

·          Oversight of underground storage tank removal.

·          Design and monitoring of soil remediation and groundwater investigation activities.

·          Reporting to and coordination with the NJDEP.

·          Cost and time analysis of implosion versus conventional demolition methods.

·          Preparation of building demolition via conventional methods and site restoration specifications and
Bid Manual.

·          Preparation of site survey, demolition plans, post-demolition grading plans, and soil erosion/sediment control plans and details.

·          Acquisition of County Soil Erosion and Sediment Control permit.

·          Bid evaluation and assistance with contractor selection.

·          Bid and construction administration services through demolition activities.

 

            For The site development activities, ADLER provided the following services:

·          Full civil site engineering design and plans.

·          Design of layout of access controlled lot and evaluation of ingress/egress routes, circulation, and pedestrian access. (Special design consideration was taken with the entrance/exit locations and lighting patterns due to the proximity of neighboring residences)

·          Design of site grading, drainage, utility, lighting, soil erosion measures, and reconstruction of approximately 50 linear feet of the City’s storm-water collection system.

·          Design of mechanical storm-water treatment system (Vortechnics system) to obtain NJDEP-CAFRA implemented water quality requirements. 

·          Coordination with City and traffic consultant for traffic signal improvements and reconstruction

·          Acquisition of County and City permits and approvals.

·          Expert testimony at both the City Planning and Zoning Boards.  

 

Ethel Road, Piscataway, NJ
Piscataway Board of Education
Piscataway, NJ

  ADLER was selected by the Piscataway Board of Education to provide environmental and engineering services associated with the demolition of the “White Building”, a former military equipment/tank maintenance building.   The building was slated to be demolished due to environmental conditions, failing integrity, and to enable future building construction by the Board of Education.  

For the demolition activities, ADLER provided the following services:

·          Environmental assessment of the building and property.

·          Asbestos survey and analysis.

·          Survey and analysis of microbiological matter (pigeon feces).

·          Preparation of environmental abatement and remediation specifications.

·          Preparation of building demolition via conventional methods and site restoration specifications.

·          Preparation of site demolition plan, post-demolition grading plan (including limited site improvements), and soil erosion/sediment control plans and details.

  Services

·          Bid evaluation and assistance with contractor selection.

·          Bid and construction administration services through demolition activities.

·          Abatement and remediation monitoring.

·          Demolition oversight.

·          Compaction testing and inspections.

Demolition activities were performed in the summer of 2002.

Demolition of the “White Building” at former Camp Kilmer

 

 

 

 